request charging
This form should take you 5-10 minutes to complete. You will need to take some photos, so please use your smartphone or tablet.
* required
start
start
How did you hear about us?
next
Contact Info
Contact *
Address *
next
Vehicle Info
Electrical Vehicle *
Ownership Status *
Select one...
Upcoming
Already Driving
Haven't Purchased Yet
Project Timeline *
Select one...
ASAP
2-3 Weeks
4+ Weeks
next
Property Info
Property Type *
Select one...
Detached House
Semi-Detached House
Townhouse
Other
Approval Status *
Select one...
I own the property
I have strata/ownership approval
I do not have strata/ownership approval yet
Year Built *
Square Footage *
Basement *
Select one...
No
Yes - Finished
Yes - Unfinished
Rental Suite *
Select one...
No
Yes - Registered
Yes - Not Registered
next
Electrical Info
Main Panel Location *
Select one...
Garage
Main Floor
Basement
Other
Electrical Service *
Look for your main shutoff switch. Usually this is the double breaker at the top or bottom of your main panel - it will have the biggest number on it (60, 100, 125, 200 are the most common).
Select one...
60
100
125
200
Other / Not Sure
Electrical Loads *
Check all that apply.
Electric Range/Oven
Electric Dryer
Electric Hot Water Tank
Electric Heating
Air Conditioning
Hot Tub
Pool
Other
Additional Info
Other electrical loads, rental suite appliances, unused circuits, future upgrades (second EV, hot tub, air conditioning, etc).
next
Upload Photos
Front of House *
Take a photo of the front of your house from 15-20' back.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Charging Location *
Take a photo of where you would like the charging solution installed from 15-20' back.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Main Electrical Panel *
Take a photo of your main electrical panel - please ensure all of the little numbers on each breaker and the breaker labels are clearly visible.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Main Shutoff Switch *
Look for the main switch at the top or bottom of your electrical panel (1 photo).
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
More Photos (optional)
Cable run obstacles, sub panels, electricity meter, etc. (1-4 photos).
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
next
Charging Solution
Charging Station *
Select one...
I need to buy one
I already have one
I don't need to buy one
Not sure
Estimated Run Length *
The estimated length of cable required between your electrical panel and charging location.
Select one...
1-10'
11-25'
26-50'
51-75'
76-100'
100' or more
Additional Info
Please include any other relevant details about your project.
next
Success!
We just sent you an email.
Shop Chargers
Oops! Please scroll up and verify that all required * fields and photos are complete.